Roma Project 1
Area : Bukit Peninsula





Highlights
Nestled on the Hill of Bukit Peninsula, the Roma Project is an off-plan Project located in the hottest community of Bingin, only 5-minute drive to Bingin Beach. Surrounded by local restaurants and tourist attractions, this uniquely designed one-story villa combines elegance with a neat–modern design. Roma Project is offered at an attractive price starting from:
IDR 3,350,000,000 for 1 Bedroom (2 units left!)
Land Size: 120 sqm
Building Size: 83 sqm
Pool: 6.5 sqm
IDR 5,100,000,000 for 2 Bedroom
Land Size: 250 sqm
Building Size: 135 sqm
Pool Size: 20 sqm
Delivery: December 2023 – Jan 2024
IDR 6,500,000,000 for 3 Bedroom
Land Size: 350 sqm
Building Size: 205 sqm
IDR 8,500,000,000 for 4 Bedroom
Land Size: 392 sqm
Building Size: 220 sqm
Pool size: 23 sqm
Delivery: Jan – March 2024
The living area is constructed to provide a bright – airy feature surrounded by green tropical plants. Roma Project also offers a Mediterranean landscape garden and pool area feeling. The 2 Bedroom Villas offers two concepts as design options:
A. Modern, minimalist, and Tropical concept
B. Mediterranean, modern with a touch of traditional concept
This Project is located in one compound consisting of 15 Units featuring 1 Bedroom, 2 Bedroom, and 3 Bedroom options completely fully furnished. The Villa elevates its furniture & equipment for unbeatable comfort. The interior design and landscaping of each purchased unit can be personalized.
No doubt, this property is perfect for a future investment plan.
Showing units are available! Payment plans are available with an option such as:
10% Down Payment
Followed by 40% Upon Signing
25% based on building Progress
20% Upon completion progress
5% upon key handover
Key Features of the Project:
- Leasehold for 27 Years with an extension of 23 years available within Market Price
- In-house management is available and may be an option/for residential purposes
- Located in the friendly community of Uluwatu, Bingin area
- Early bird, affordable price
- 5 years of building Warranty
Additional Information:
- IMB/Building Permit: PBG in Process
- Building year 2023 (On Progress)
- Only nine units left from 15 in total
- The project offers an in-house management or a residential option with a complex monthly fee.
- The project completion is targeted by January 2024
Facilities
Indoor Living Area
- Fully Furnished
- 1 Floor Building
- Enclosed Living Room
- 1 Air Conditioning Unit
- Couch
- TV
- Bedrooms
- 1 Double Bedroom
- 1 Air Conditioning Unit
- 1 Ceiling Fan
- Bathrooms
- 1 En-suite Bathroom
- Kitchen
- Fully Equipped
Outdoor Living Area
- Private Pool (6,5 sqm)
- Terrace
- Sunbeds
- Outdoor Shower
- Parking Lot
- Storage Room